Restoring a 50-year-old Battery Charger for Norwich Aviation Museum
Read more about how Castlet serviced and calibrated a legacy battery charger for Norwich Aviation Museum.
View More
Read more about how Castlet serviced and calibrated a legacy battery charger for Norwich Aviation Museum.
View MoreRead more about how Castlet designed and built a bespoke solution for an aerospace client.
View MoreRead more about how Castlet eliminated the risk of downtime for a leading European glass manufacturer in France.
View MoreWe designed and assembled a MIGI rapper control panel for ESP cleaning to improve maintenance turnaround time for our client.
View MoreRetrofitting the electrostatic precipitator (ESP) control system at a power station in Australia.
View MoreRead more about how Castlet worked with a world leading water treatment company to retrofit their oil rig electrochlorination system with minimal downtime.
View MoreCastlet engineered a solution that needed to last for up to 20 years for the Ministry of Defence, fitting a multi-purpose battery testing equipment.
View MoreRead more about how Castlet provided essential equipment for a world leading defence contractor.
View MoreRead more about how Castlet installed a new switch room space for electrical equipment in Saudi Arabia.
View MoreRead about how Castler combined three transformer rectifiers to help an Indian electrochlorination package manufacturer save on costs.
View More