A World leading Water Treatment company

Sector: Industrial

A World leading water treatment company

The problem

The offshore oil rig was undergoing a major refit and the requirement was to replace the existing Electrochlorination system. As the project was a retrofit there was a limitation on the size and weight of the equipment to enable it to fit into the existing space.

The solution

Castlet, designed a bespoke unit rated at 60V / 1415A DC to closely match the footprint and connection points of the original package, both for the water and electrical connections. This bespoke design ensured minimal changes were required by the end customer to enable the new equipment to directly replace the original package. As part of the upgrade new technology was incorporated into the design which should result in a reduced downtime compared to the original installation.